Project Title: Replace 24" Hydrogen Vent Line:
Installed a 24" stainless steel hydrogen vent line at the A-1 Stand for NASA. This included the removal of approximately 1,160' of aluminum pipe and the replacement of 1,160' of 24" stainless steel pipe. The project included new pipe shoes, made of stainless steel and the reuse of existing concrete pipe supports. The pipe was cleaned using a high-pressure hot water blast, and each weld was radiographed 100%.
Project Title: Install Underground Storage Facility:
For this project we installed an underground fuel tank system for NASA, this project took place behind the E Complex. It involved purchasing two fuel tanks a 20,000 gal RP Tank and a 10,000 gal Jet Fuel Tank. Along with pipe supports, stainless steel pipe and various pumps, valves and other inline devices. also, including concrete foundations the two foundations for the underground tank were 18' below ground. After the installation was completed, the system required precision cleaning.
Project Title: LOX Safe Heaven
This project consists of the installation of cryogenic piping along with stainless process piping to expand the barge docks and truck loading facility. With the experience of Eden Cryogenics, the engineering and fabrication of the VJ piping is being completed with great team work. This project also includes structual foundations and structual steel, including two new barge dock leveling systems.
A few to list:
and more: